Pre-approved ADU plans in California
Assembly Bill 1332 (2023) added Government Code section 65852.27. It required every city and county to create a program for pre-approving ADU plans by January 1, 2025. The key rules:
- 30-day decision. A city must approve or deny an application for a detached ADU within 30 days if it uses a plan the city pre-approved, or a plan identical to one it approved during the current triennial code cycle. A custom ADU application gets up to 60 days.
- Anyone can submit plans. An architect, builder or nonprofit can ask a city to pre-approve its design, and the city can't restrict who submits.
- Plans go online. Approved plans must be posted on the city's website with the designer's contact information.
- Same fees. A city may charge the same permit fees it would charge for a comparable ADU.
The faster clock applies only to detached ADUs. For the rest of the state rules, see our guide to California ADU laws.
Pre-approved ADU plans in San Diego County
Programs fall into two types. Some governments paid to design plans and give them away. Others list plans that private designers submitted, which you license from the designer.
| Jurisdiction | Plans and sizes | Cost of plans | Notes |
|---|---|---|---|
| County of San Diego (unincorporated) | 6 ADU plans, 600–1,200 sq ft, 1–3 bedrooms | Free | About 85% complete; PDF and CAD files |
| City of San Diego | Accepts County, Chula Vista and Encinitas plans | Ask the plan provider | 30-day review; plan must meet city code |
| Chula Vista | Standard plans from approved designers | You contract with the designer | About $1,000 less in plan review fees |
| Encinitas | PRADU plans, studio to 3 bedrooms | Downloadable from the city | Accepted by San Diego and Santee |
| Escondido | 4 plans, 484–1,000 sq ft, studio to 3 bedrooms | Free | New detached, single-story only |
| Carlsbad | 4 floor plans in 3 styles, single-story detached | Free | City has been updating them to the 2025 codes |
| San Marcos | City-provided detached, one-story plans | City-provided | No alterations allowed; 30-day decision |
| Oceanside | Library of designer-submitted plans | Bought from the plan vendor | City page said none submitted yet; 30-day review |
| Poway | Architect-submitted plans | Architect may charge a fee | Policy (2025) said none submitted yet |
| Santee | Accepts County, Chula Vista and Encinitas plans | Depends on the plan | Fee waiver ended September 2024 |
Sources: each jurisdiction's program page. Program details change, so confirm with the permit office before you commit to a plan.
County of San Diego ADU plans
The County's plans are the most widely used in the region. They're free, designed to work anywhere in the unincorporated county, and come in six ADU sizes: three at 1,200 sq ft, and one each at 1,000, 800 and 600 sq ft. The County also offers two larger plans for a single-family home only. The current plan sheets reference the 2025 California codes. The City of San Diego and the City of Santee both accept them.
City of San Diego
The City of San Diego doesn't publish its own plan set. It accepts the County of San Diego standard plans, the City of Chula Vista standard plans and the City of Encinitas permit-ready plans, with a 30-day review. The plan still has to meet the San Diego Municipal Code, and you contact the plan provider about any license cost. Designers can also apply to have their own plans pre-approved for use by others.
Chula Vista pre-approved ADU plans
Chula Vista's standard ADU plans come from design professionals the city approves. To use one, you contract with the designer responsible for that plan set. The city says applicants pay roughly $1,000 less in plan review fees than for a full custom submittal.
Encinitas PRADU
Encinitas's Permit-Ready ADU (PRADU) program offers plans for detached units from a studio to three bedrooms. Because the City of San Diego and Santee accept them, Encinitas plans reach well beyond Encinitas.
Escondido PAADU
Escondido offers four free plans: a 484 sq ft studio or one-bedroom, a 644 sq ft two-bedroom, an 851 sq ft two-bedroom with two baths, and a 1,000 sq ft unit with two or three bedrooms and two baths. They're for new, detached, single-story ADUs only, not conversions, attached units, second stories or prefab units.
Free ADU plans vs. licensed plans
“Pre-approved” doesn't always mean free. The County of San Diego and Escondido give their plans away. Carlsbad's permit-ready plans are free to download. But in Chula Vista you contract with the plan's designer, in Poway the architect must authorize use of the plans and may charge for it, and in Oceanside you buy the package from the plan vendor. When you use an accepted plan in the City of San Diego, the city tells you to ask the provider what the license costs.
A licensed plan can still be worth it. The designer usually knows the plan's quirks and can complete the site-specific pieces for you.
What pre-approval covers, and what it doesn't
A pre-approved plan has been checked against the building code for the structure itself. It hasn't been checked against your lot. The County calls its plans “approximately 85% complete.” Across the programs, you still need:
| Item | Who requires it |
|---|---|
| Site plan showing the ADU on your lot, setbacks and utilities | County, Chula Vista, San Marcos, Oceanside, Escondido |
| Energy (Title 24) calculations | County, Chula Vista, Poway |
| Roof truss design or calculations | County, Poway, San Marcos |
| Stormwater plan and forms | County |
| Soils (geotechnical) report or waiver | Chula Vista, Poway |
| Grading and drainage plans | Oceanside, Poway (grading permit) |
| Fire district approval; landscaping plan in very high fire zones | County, Poway |
| Utility connections and engineering | Chula Vista, Oceanside |
Sources: County checklist PDS 607 and city program pages. Zoning still applies too: the ADU has to meet your city's setback, height and lot rules.
The plan also doesn't cover the foundation conditions on your site. A plan assumes a certain soil bearing strength. Poway, for example, requires a soils report showing your site meets the strength the plan was designed for. A sloped lot, poor soil or a long utility run adds cost no matter whose plan you use.
Changing a pre-approved plan
The speed comes from using the plan as drawn. Change too much and you're back to a custom review.
- Escondido: you can't change the size, shape or configuration, but you can change select features, including windows and doors.
- San Marcos: no alterations to city plans are considered. A customized design goes through the standard ADU permit.
- Carlsbad: modified plans aren't eligible for expedited processing.
- State law: the 30-day clock applies to a pre-approved plan or one identical to a plan already approved in the current code cycle.
How much you save
The savings are real but modest. Snap ADU, a San Diego builder, estimates (April 2026):
| Item | Estimate |
|---|---|
| Custom plans from an architecture firm | $15,000 or more |
| Design cost saved with a pre-approved plan | About $6,000–8,000 |
| Added cost to modify a pre-approved plan | About $2,000–4,000 |
| Design time saved | Up to 6–8 weeks |
| Construction share of total budget | 90–95% |
Source: Snap ADU, a builder, not an official figure. Because construction is most of the budget, the plan choice matters less than the builder. Snap ADU also notes that overall timelines often end up close to a custom design once site work and corrections are counted. In Chula Vista, add the roughly $1,000 plan review discount.
When a pre-approved plan fits
A pre-approved plan works best when:
- Your lot is fairly flat with room for a single-story detached unit.
- One of the published sizes matches what you want. Our guide to ADU floor plans and sizes shows what fits at each size.
- You don't need a garage conversion, attached unit or second story. Those need custom plans; see garage conversion ADUs and two-story ADUs.
Either way, you still need a licensed builder. Compare verified ADU builders in San Diego, check a contractor's license, and read how to hire an ADU contractor. For the permit steps that follow, see our San Diego ADU permit guide.
Common questions
Does the City of San Diego have pre-approved ADU plans?
Are pre-approved ADU plans free in San Diego?
How long does a pre-approved ADU plan take to get a permit?
What sizes are the County of San Diego ADU plans?
Can I modify pre-approved ADU plans?
Sources
- California Legislative InformationGovernment Code § 65852.27 (preapproved ADU plans, added by AB 1332)
- California Building Officials (CALBO)Pre-Approved ADU Plans (AB 1332 summary)
- County of San Diego Planning & Development ServicesDwelling Unit Building Plans (Plans A–H)
- County of San Diego Planning & Development ServicesLetter on the County's pre-approved ADU plans
- County of San Diego Planning & Development ServicesStandard ADU Checklist, form PDS 607
- County of San Diego Planning & Development ServicesAccessory Dwelling Units
- City of San Diego Development ServicesAccessory Dwelling Unit/Junior Accessory Dwelling Unit
- City of Chula VistaAccessory Dwelling Units (ADU)
- City of EncinitasPermit-Ready Accessory Dwelling Unit (PRADU) Program
- City of EscondidoPre-Approved ADU Program (PAADU)
- City of EscondidoPAADU Frequently Asked Questions
- City of CarlsbadAccessory Dwelling Unit Permit Ready Program
- City of San MarcosPermit-Ready ADUs
- City of OceansidePre-Approved ADU Program
- City of PowayPre-Approved ADU Policy (effective March 4, 2025)
- City of SanteeAccessory Dwelling Units
- Snap ADUGuide to San Diego pre-approved ADU plans (April 2026)
- California Building Standards CommissionCalifornia Building Standards Codes
- County of San Diego Planning & Development ServicesPlan F, 600 sq ft dwelling unit (11×17 plan set)
- Snap ADUAll about ADU fees and waivers (fee table updated February 2026)
- California Legislative InformationGovernment Code § 66317 (ADU permit timelines)
- City of CarlsbadPermit Ready ADU checklist
General information, not legal or financial advice. Rules and fees change; confirm with your city's permit office before you rely on them.