IL Total Design and Build
Escondido
- Active license
- Bond on file
- Insured
- 7 yrs licensed
Del Mar ADU rules sit on top of the California Coastal Act: the whole city is in the coastal zone, so most new ADUs need an administrative coastal permit as well as a building permit. Here's what the city's code allows, what it costs, and how to apply.
Del Mar ADU facts
None of our verified builders is based in Del Mar yet; these work across San Diego County. Each holds an active B license with a bond on file, checked with the state on Oct 26, 2026.
Escondido
San Diego
San Diego
San Diego
Chula Vista
San Diego
Del Mar's ADU rules are in Municipal Code Chapter 30.91. The city adopted the current version as Ordinance No. 1002 on December 18, 2023, but because it also amends the Local Coastal Program, it couldn't take effect until the Coastal Commission certified it. According to the city's ADU page, the Commission conditionally certified it on March 13, 2025, the City Council accepted the required changes on May 19, 2025, and the rules took effect June 12, 2025. The city posts the full June 2025 text of Chapter 30.91; the table below summarizes it.
| Rule | Del Mar |
|---|---|
| Number per single-family lot | One ADU plus one junior ADU. The JADU must be inside the house and pairs only with a detached ADU |
| Detached ADU size | 850 sq ft, or 1,000 sq ft with more than one bedroom; anything over 800 sq ft counts against the lot's floor area and coverage limits |
| Attached ADU size | 50% of the house, or 800 sq ft if the house is under 1,600 sq ft |
| Junior ADU | Up to 500 sq ft, inside the house (an attached garage counts); single-family zones only |
| Height | 16 ft detached; 18 ft within a half-mile walk of a major transit stop; 14 ft in the Bluff, Slope and Canyon Overlay Zone |
| Second-story ADU | Only if there's no buildable area on the first floor; 25 ft max, two stories |
| Setbacks | 4 ft side and rear, no eaves in the setback; the zone's street setbacks still apply; 6 ft between buildings |
| Rentals | Longer than 30 days; the ADU can't be sold separately |
Lots with an existing duplex can add up to two ADUs, and buildings with three or more units can convert unused space into ADUs for up to 25% of the units, plus two detached ADUs, under the same city guidance.
Del Mar applies a long list of objective design standards to new ADUs, unless they would make an 800 sq ft ADU impossible. Under Section 30.91.040:
The city adopted these partly because, as the ordinance's findings put it, residents testified that ADUs were being built as home offices, recreation rooms and ways to gain ocean views rather than as housing. Plan your ADU as a real dwelling with a full kitchen and bathroom. The state rules behind all this are in California ADU laws; see also our junior ADU guide and two-story ADU guide.
We couldn't find a state housing department (HCD) review letter on Del Mar's ADU ordinance.
Del Mar is located entirely within the coastal zone, so ADU projects must meet the Coastal Act and the city's Local Coastal Program. Under the current code, an ADU needs an Administrative Coastal Development Permit unless it is one of two exceptions: a conversion of existing, legally built living space inside the house that doesn't remove or replace major structural parts like the roof, exterior walls or foundation, or an attached ADU that already qualifies as exempt under the Coastal Commission's regulations.
That is stricter than Del Mar's old rules. The Coastal Commission's staff report notes that the city's 2018 provisions exempted most ADUs outside the Commission's appeal area from coastal permits; the Commission narrowed that exemption as a condition of certifying the 2023 ordinance.
The administrative coastal permit adds steps, but no public hearing:
The code also keeps coastal setbacks in force. A new ADU must respect the coastal bluff setback, the Beach Preservation Initiative setback in the Beach Overlay Zone, steep-slope and wetland buffers, and, where needed to protect public views to the ocean, the zone's full side and rear setbacks. ADUs are not allowed on a beach, in a wetland or habitat area, or in a designated highly scenic area. If adding an ADU leads to redevelopment of a house that doesn't meet bluff, view or habitat setbacks, the city requires you to correct those nonconforming conditions.
Most California cities can't require parking for an ADU near transit. Del Mar can in two situations, to protect public beach parking and emergency access. Under Section 30.91.040(P):
If you convert or demolish a garage, the city requires replacement parking only if losing it would significantly affect public access to the shoreline. The application asks whether your lot is between the ocean and the first public road, so check that early. For garage projects, see our garage conversion ADU guide.
The state's 2025 fire hazard maps significantly expanded the parts of Del Mar designated High and Very High Fire Hazard Severity Zones, especially neighborhoods next to open space. The City Council adopted the maps on June 16, 2025. New construction in those zones must meet Chapter 7A of the California Building Code for wildfire-resistant construction. You can look up your parcel on the city's map viewer linked from that page.
On a lot that is wholly or partly in a Very High zone, Del Mar's ADU code requires you to show at least two emergency evacuation routes and prepare an evacuation map for the parcel, or prove an equivalent safety measure. ADUs in the FEMA flood zone must be elevated and floodproofed with sea level rise in mind, with height measured from the base flood elevation, and ADUs on coastal bluff lots need a geotechnical report. These requirements add design and consulting time, so build them into your budget and schedule.
We found no Del Mar program of permit-ready, pre-approved ADU plans of the kind that state law encourages. What the city does offer, paid for with a state SB 2 planning grant, is three free sample floor plans by Stephen Dalton Architects, designed to meet state law and the city code and to be fully ADA accessible:
| Plan | Size |
|---|---|
| Studio | 446 sq ft |
| One bedroom, one bath | 793 sq ft |
| Two bedrooms, one bath | 955 sq ft |
They are floor plans only, in PDF and CAD, so you still need full construction drawings, a site plan and the coastal permit. The 955 sq ft plan has two bedrooms, which fits under Del Mar's 1,000 sq ft limit for multi-bedroom ADUs. For other plan libraries in the region, see our pre-approved ADU plans guide.
| Fee | Amount |
|---|---|
| ADU planning application | $1,227 |
| Engineering ADU review and inspection | $771 per review cycle; $534 for each additional review |
| Coastal development permit, staff level | $342 |
| High school fee (San Dieguito Union) | $2.83 per sq ft of livable space; 500 sq ft or less exempt |
| Elementary school fee | Set by your elementary district; Del Mar Union quotes it by address |
| Water and sewer connection | None for conversions with an adequate meter; otherwise proportional to the ADU's size and plumbing fixtures |
Engineering review is required for new attached and detached ADUs, but not for ADUs inside the house, inside an existing accessory structure, or in a converted garage, according to the city's ADU application packet. The fee schedule doesn't list an ADU building permit fee, so ask the Building Division for an estimate. Under state law, a city can't charge impact fees on an ADU under 750 sq ft, and above that the fee must be proportional to the main house.
San Dieguito Union High School District's fee page says it also collects school fees for the Del Mar Union and Solana Beach elementary districts, by appointment and by check only. For what an ADU costs to build, see what an ADU costs in San Diego or run the ADU cost calculator.
Del Mar's housing plan sets a goal of 15 ADUs rented to low-income households by April 2029, according to the city. Two programs support it:
If you're weighing rent against cost, see ADU rental income in San Diego.
Applications go to the Department of Planning and Community Development at City Hall, 1050 Camino del Mar. The application packet lists phone 858-755-9313, email planning@delmar.ca.us, and counter hours of Monday and Wednesday, 1 to 5:30 p.m. You submit:
Before the building permit is issued you must record a deed restriction with the County Recorder covering the ADU's sale, occupancy and rental limits, and the city requires a certification of height, setbacks and square footage before framing inspection. Once your application is complete, state law gives the city 60 days to approve or deny it, and the city's ADU page says compliant plans will be approved within that window. An ADU permit expires after two years if no certificate of occupancy has been issued.
Before you sign a contract, read how to hire an ADU contractor, check a contractor's license, and compare verified ADU builders in San Diego County.
General information, updated Oct 26, 2026. Rules and fees change; confirm with the Del Mar permit office before you rely on them.