The answer to “how many ADUs can I build” depends on what's on your lot today: a single-family home gets up to three extra units under state law, an apartment building can get far more, and the City of San Diego adds a bonus program on top. Here's the count for each lot type, including what changes on January 1, 2027.

Fact-checked against 15 sourcesUpdated Oct 27, 2026

Homes being framed, one with blue sheathing on its side

How many ADUs can I build? The quick table

State law sets the minimum every city has to approve by permit, with no hearing. Cities can allow more, and San Diego does. Find your lot type below, then read the section for the details.

How many ADUs are allowed in California, by lot type
What's on your lotMost ADUs a city must approveJunior ADU?Rule
One single-family home (2026)2: one conversion, one new detachedYes, oneGov. Code 66323
One single-family home (from Jan 1, 2027)3: one conversion, two new detachedCity may decline if two detached are builtAB 956
Duplex (two attached units)3: one conversion, two detachedNoGov. Code 66323; HCD
Existing apartment buildingConversions up to 25% of units (min. 1) + detached up to 8, not more than existing unitsNoGov. Code 66323
Proposed multifamily building2 detachedNoGov. Code 66323
Eligible single-family lot, City of San Diego bonusUp to 4 / 5 / 6 ADUs and JADUs by lot sizeCounted in the capSDMC 141.0302
SB 9 lot split2 units per new lot, counting ADUs and JADUsCountedGov. Code 66411.7

Sources: Government Code § 66323, the state housing department's ADU handbook, AB 956 and San Diego's ADU code. Each new unit still has to meet building codes and fit on the lot. For every other ADU rule, see our guide to California ADU laws.

ADUs on a single-family lot

On a lot with one house, section 66323 requires every city to approve these together:

  • One conversion ADU inside the existing house or an existing accessory building, such as a garage. It can grow up to 150 sq ft for an entrance.
  • One new detached ADU of up to 800 sq ft, with side and rear setbacks of no more than 4 feet.
  • One junior ADU, up to 500 sq ft inside the house, which is limited to one per lot and only on a lot with a single-family home.

That's three units plus the house. Not every lot can use all three: you need existing space to convert and room in the yard for the detached unit. Garage conversions are the most common way to use the conversion slot; see our garage conversion ADU guide and the junior ADU guide.

How many ADUs can you have on a property in San Diego without the bonus?

The City of San Diego writes the state minimum into its code. The city's ADU bulletin also has a crossover rule: a legally permitted multi-unit building in a single-family zone uses the multifamily counts, and a lone house in a multifamily zone uses the single-family ones. Above the state minimum, more units come through the city's bonus program, covered below.

Two detached ADUs from 2027

Governor Newsom signed AB 956 on September 29, 2026. Starting January 1, 2027, cities must approve two new detached ADUs on a single-family lot instead of one. The trade-off: a city isn't required to approve a junior ADU on a lot where two new detached ADUs have been built, though it may.

ADUs on a single-family lot: 2026 vs 2027
CombinationThrough Dec 31, 2026From Jan 1, 2027
Conversion + 1 detached + JADUMust approveMust approve
Conversion + 2 detachedCity's choiceMust approve
Conversion + 2 detached + JADUCity's choiceJADU at the city's choice

If you're designing two backyard units now, time your permit for the 2027 rules or confirm your city's ordinance allows a second unit today. Our guide to California ADU laws for 2027 covers AB 956 and the impact fee change that came with it.

ADUs on a duplex or apartment lot

A lot with two or more attached homes counts as multifamily. State law lets you combine two kinds of ADU there:

  • Conversions of non-livable space such as storage rooms, boiler rooms, attics, basements and garages: at least one, up to 25% of the existing units.
  • Detached ADUs: up to eight, but not more than the number of existing units. On a lot where the multifamily building is still being permitted, up to two.
How many ADUs on a multifamily property
Existing unitsConversionsDetachedTotal ADUs
2 (duplex)123
4145
82810
205813

HCD's handbook says the two kinds stack, and that a JADU is only for single-family lots, so a duplex doesn't get one. Rounding of the 25% figure and other details are in our multifamily ADU guide.

San Diego's ADU Home Density Bonus

The City of San Diego lets some owners build more ADUs than the state requires, in exchange for affordable ones. Under SDMC § 141.0302, inside the city's Sustainable Development Area you get one bonus ADU for each ADU rented at restricted affordable rents. Bonus and affordable ADUs need fire sprinklers, one parking space each outside a transit priority area, and a Community Enhancement Fee.

The 2025 caps by lot size

The City Council cut the program back in June 2025. A Sheppard Mullin summary in the National Law Review lists the caps on single-family lots:

City of San Diego ADU Home Density Bonus caps on single-family lots (2025)
Lot sizeMost ADUs and JADUs
Up to 8,000 sq ft4
8,001 to 10,000 sq ft5
10,001 sq ft or more6

The same summary says the program is now barred in the RS-1-1 through RS-1-4 and RS-1-8 through RS-1-11 zones unless the lot is in a High or Highest California Tax Credit Allocation Committee (CTCAC) Opportunity Area, stays in the RS-1-5, RS-1-6 and RS-1-7 zones, and isn't changed in multifamily zones. Check your zone on the city's zoning map, then confirm eligibility with Development Services before you design for bonus units.

The third ADU pays impact fees. San Diego's fee code exempts the first two ADUs on a property from development impact fees. Bonus units beyond that pay them, on top of the Community Enhancement Fee. Price that into any plan for three or more units, and see what an ADU costs in San Diego.

Adding SB 9 to the count

SB 9 is a separate state law that lets you build two primary homes on a single-family lot, split the lot in two, or both. It changes the ADU count in different ways:

  • Two homes, no split. HCD's fact sheet says the lot can have up to two primary homes under SB 9 plus the ADUs ADU law allows. In the City of San Diego, Information Bulletin 409 caps that combination at four units in total.
  • A lot split. Each new lot can have two units, and the lot split statute counts ADUs and JADUs as units. A city also doesn't have to permit any ADU on a lot that uses both the split and the two-unit law, under section 65852.21. San Diego doesn't allow it.
  • ADUs first, split later. The ADU handbook says a city doesn't have to approve an SB 9 split if ADU law, alone or with SB 9, has already put more than four units on the lot.

Our SB 9 vs ADU guide compares fees, eligibility and selling for each path.

What else limits the count

The legal maximum is a ceiling. These often decide the real number:

  • Space to convert. The conversion ADU needs an existing structure. No garage or spare room, no conversion slot.
  • Yard and setbacks. Detached units need room for 4-foot setbacks, access paths and separation from other buildings. See ADU setbacks in California.
  • Utilities. Each unit needs water, sewer and power capacity; several units may need a service upgrade. See ADU utilities.
  • Fees. No impact fees for an ADU of 750 sq ft or less, but costs multiply with each unit.
  • Fire and coastal zones. Extra rules apply; see ADUs in fire zones and coastal ADUs.

Sizing each unit is its own decision: our guides to the 1000 sq ft ADU, the 1200 square foot ADU and ADU floor plans compare what fits and what it costs. Run a budget in our ADU cost calculator. A builder who has done multi-unit projects will spot the real limits fast; compare verified ADU builders in San Diego or our best ADU builders in San Diego, check a contractor's license and read how to hire an ADU contractor.

Common questions

How many ADUs can I build on my property?
On a single-family lot in California, up to three units besides the house: one ADU converted from existing space, one new detached ADU of up to 800 sq ft, and one junior ADU. From January 1, 2027, cities must allow two new detached ADUs. Multifamily lots and San Diego's bonus program allow more.
How many ADUs are allowed in California?
It depends on the lot. A single-family lot gets a conversion ADU, a detached ADU and a junior ADU. A lot with an existing apartment building gets conversions up to 25% of its units plus up to eight detached ADUs, capped at the number of existing units.
Can I build two ADUs on my lot?
Yes, if you have existing space to convert: a conversion ADU plus a new detached ADU is allowed today. Two new detached ADUs become a state requirement on single-family lots on January 1, 2027, under AB 956.
How many ADUs can you build in San Diego?
At least the state minimum. On eligible single-family lots, the city's ADU Home Density Bonus allows up to 4, 5 or 6 ADUs and JADUs depending on lot size (up to 8,000 sq ft, 8,001–10,000, and over 10,000), in exchange for affordable units. The bonus is barred in several single-family zones.
Can I build ADUs and use SB 9 on the same lot?
Yes, with limits. Without a lot split, HCD says you can have two SB 9 homes plus ADUs, and the City of San Diego caps that at four units. After a split, each new lot gets two units, counting ADUs.

Sources

General information, not legal or financial advice. Rules and fees change; confirm with your city's permit office before you rely on them.

Compare builders the state has checked.

Every San Diego builder on our list holds an active B license with a bond on file.