How we built this list
We don't rank or recommend builders. Every price below comes from the company's own website as it read on October 27, 2026, and companies change prices often. Where a company didn't publish a price, we say so instead of filling the gap from news stories or review sites. The companies are listed alphabetically. Inclusion isn't an endorsement, and a company being absent says nothing about it.
“Prefab” covers several legal categories: modular units with a state insignia, HUD-code manufactured homes and panelized kits. Our guide to the prefab ADU in California explains how each is approved, and modular vs manufactured ADUs compares them on financing and foundations. If you have a garage, converting it is often cheaper than any factory unit; see our garage conversion ADU guide and the garage conversion cost breakdown. Looking smaller still? Read about the tiny home ADU.
Prefab ADU companies in California compared
| Company | What it sells | Published sizes | Published price | Price covers |
|---|---|---|---|---|
| Abodu | Factory-built units, delivered and craned in | 385–1,195 sq ft, studio to 3 bed | All-in $298,800–$498,800 | Unit, design, permits, foundation, site work, set |
| Acton ADU | Site-built ADUs (the company says not prefab) | Featured model 888 sq ft, 2 bed | None; request an estimate | Design through inspections, per its site |
| Boxabl | Factory-built Casita units | Studio, 1 and 2 bed (sizes not on home page) | Monthly payment from $895/mo, not a price | Varies with site work, delivery, installation |
| Samara (Backyard) | Factory-built units, installed | Studio to XL; XL 9 is 875 sq ft, 2 bed | From $152K plus installation | Unit; installation quoted per property |
| Studio Home (formerly Studio Shed) | Panelized kits shipped flat from Colorado | About 450–1,000 sq ft ADU models | From $123,146 plus installation | Kit; assembly and foundation extra |
Every figure in the table links to the company's own page. Plant Prefab, Connect Homes, Mighty Buildings and Villa are covered below, because we couldn't confirm a current published ADU offer for them.
Abodu ADU prices by model
Abodu's pricing page splits every model into a home price and an installation price. Per-square-foot figures are our arithmetic from those numbers.
| Model | Size | Beds / baths | Home | Installation | All-in | All-in per sq ft |
|---|---|---|---|---|---|---|
| Studio | 385 sq ft | Studio / 1 | $234,800 | $64,000 | $298,800 | About $776 |
| One | 500 sq ft | 1 / 1 | $260,800 | $64,000 | $324,800 | About $650 |
| Two | 625 sq ft | 2 / 1 | $293,800 | $65,000 | $358,800 | About $574 |
| Two+ | 800 sq ft | 2 / 2 | $328,800 | $96,000 | $424,800 | About $531 |
| Three | 1,070 sq ft | 3 / 2 | $364,800 | $100,000 | $464,800 | About $434 |
| Three+ | 1,195 sq ft | 3 / 3 | $393,800 | $105,000 | $498,800 | About $417 |
The pattern holds across the industry: small units cost the most per square foot, because the kitchen, bath, foundation, utilities and permit cost about the same at any size.
Samara Backyard
Samara's Backyard page lists six models and a starting price of $152K “plus installation,” and says Backyard is available in California. Its FAQ says installation is priced per property and covers project management, permit allowances, surveys, utility connections, crane and traffic control, entry stairs and solar. It also says payments are spread across milestones and that it won't collect payment or start work until you've secured financing.
Studio Home (Studio Shed) ADU kits
Studio Home's ADU page (studioshed.com now redirects there) lists models such as the 490 sq ft Larch from $123,146 and the 618–682 sq ft Laurel from $143,100, each “+ installation.” The kits are panelized and ship flat-packed from Colorado for on-site assembly. A kit price is not a finished ADU: foundation, utilities, assembly, permits and fees come on top, and you'll need a licensed contractor to build it. For prefab ADU kits in general, our guide to Amazon and Home Depot tiny home kits covers what a kit leaves out.
Acton ADU
People often search for Acton ADU alongside prefab companies, but Acton's own site describes its homes as traditionally site-built, not prefab or mobile, and it is based in Campbell in the Bay Area. It publishes no prices.
What the published prices include, and what they don't
To compare quotes, line them up against one clearly itemized offer. Abodu lists what sits in and out of its price, which makes a useful checklist for any company:
| Item | In the published all-in price? |
|---|---|
| Factory-built unit, design, engineering, permits and plan check | Included (home price) |
| Fire sprinklers and delivery | Included (home price) |
| Foundation and site work | Included (installation) |
| Utility trenching | Up to 50 ft included; more is extra |
| Crane set | Up to 100 ft included; more is extra |
| Boundary survey, staking, certification | Extra: $6,000 |
| Demolition, tree removal, unusual engineering | Extra |
| Sales tax | Extra |
Source: Abodu pricing, October 2026. On top of any company's quote, ask about items that depend on your lot. Snap ADU's San Diego sitework guide lists a separate SDG&E meter at $10,500–$15,000 and retaining walls at $20,000–$30,000+, and its fee table puts City of San Diego fees at $10,734 for a 499 sq ft ADU (a builder's figures, not official fees). Across turnkey prefab offers, Snap ADU's October 2026 survey found 800 sq ft two-bedroom units in California ran about $280K to $430K all-in. Snap ADU builds site-built ADUs, so read that as one builder's view.
For prefab ADU cost in context, see what an ADU costs in San Diego or try the ADU cost calculator.
Companies we couldn't confirm
Several well-known names don't have a current, published ADU offer we could verify. That doesn't mean they're closed; it means you should confirm directly before relying on an old article or listing.
- Connect Homes. As of October 2026, connect-homes.com redirects to Connect Shelters, which markets temporary and permanent modular housing and doesn't mention ADUs. We found no current published ADU price.
- Mighty Buildings. The Oakland 3D-printed prefab builder put itself up for sale in January 2025 and laid off a major portion of its staff, according to Fabbaloo. Its website didn't load when we checked. We couldn't confirm it takes ADU orders.
- Plant Prefab. Its website describes panelized and modular components for housing and hospitality projects, but publishes no ADU models or prices.
- Villa. We couldn't load a current published price on Villa's own website. Ask the company for its price list and what it includes.
Prefab ADUs in San Diego
Service areas matter as much as price. Abodu's FAQ says it serves California “generally in the San Francisco Bay Area and Greater Los Angeles Area”; it doesn't mention San Diego. Samara's FAQ names no service area. Ask any company whether it has installed units in your city and who does the local site work.
For a prefab ADU in San Diego, the unit comes from the factory but the foundation, trenching, utilities and permit are local work, often done by a local general contractor. You can compare verified ADU builders in San Diego who can install a factory unit or build on site, read our shortlist of the best ADU builders in San Diego, and see the steps for getting an ADU permit in San Diego.
How to vet a prefab ADU company
- Find the license, then check it. The Contractors State License Board says a B, General Building contractor can build or install ADUs, and a C-47 can install a manufactured-home ADU. Look up the exact company name on the state's Instant License Check or check a contractor's license on our site. If the seller isn't licensed, find out who holds the license for your site work.
- Ask what label the unit carries. A modular unit sold in California must carry an HCD insignia of approval; a manufactured home carries a HUD certification label on each section. A panelized kit may carry neither and is inspected by your city. Neither Boxabl's home page nor Studio Home's ADU page says directly whether it delivers in California, so ask.
- Know the deposit rule. On a home improvement contract, California law caps the down payment at $1,000 or 10% of the price, whichever is less, and bars payments ahead of completed work. A unit purchase agreement may be structured differently, so ask how much you'll have paid before the unit leaves the factory.
- Get one all-in number for your lot. Use the checklist above: trenching length, crane distance, survey, demolition, fees and meter.
- Visit an installed unit. A showroom shows finishes; a finished backyard project shows the site work.
For contracts, liens and payment schedules, read how to hire an ADU contractor, and our broader look at ADU companies.
When prefab companies fail
- Anchored Tiny Homes (Fair Oaks), which sold tiny homes and ADUs, closed in 2024. A former executive said 450 customers were left stranded; one customer reported losing a $28,000 payment.
- Multitaskr (Chula Vista) collapsed in 2024, and the average claim per ADU topped $200,000.
- Nonna Homes (Rancho Cordova) had its license suspended in January 2026.
All held or worked under contractor licenses. A license is the floor, not a guarantee; payment timing is your best protection.
Common questions
Which prefab ADU companies operate in California?
How much does a prefab ADU cost from these companies?
Is Acton ADU a prefab company?
Do prefab ADU companies serve San Diego?
What license should a prefab ADU company have?
Sources
- AboduPricing (checked October 27, 2026)
- AboduFAQ
- SamaraBackyard (checked October 27, 2026)
- SamaraBackyard FAQ
- Studio Home (formerly Studio Shed)ADU models (checked October 27, 2026)
- Acton ADUHome page
- Plant PrefabHome page
- Connect SheltersHome page (connect-homes.com redirects here)
- BoxablHome page
- FabbalooMighty Buildings for sale: California 3D printed housing firm seeks buyer (January 2025)
- Snap ADUPrefab ADUs vs stick-built ADUs (October 2, 2026)
- Contractors State License BoardFast Facts: Accessory Dwelling Units (Rev. 11/2025)
- Contractors State License BoardInstant License Check
- California Legislative InformationBusiness and Professions Code § 7159.5 (down payments)
- California Legislative InformationHealth and Safety Code § 19980 (insignia of approval)
- Electronic Code of Federal Regulations (HUD)24 CFR § 3280.11, Certification label
- ABC7 NewsAnchored Tiny Homes shuts down
- NBC 7 San DiegoSan Diego homeowners stuck with massive debt from uncompleted ADU projects
- NBC Bay AreaADU builder Nonna Homes suspended
- Snap ADUCost drivers: ADU sitework
- Snap ADUAll about ADU fees and waivers (fee table February 2026)
General information, not legal or financial advice. Rules and fees change; confirm with your city's permit office before you rely on them.