West Coast ADUs
Santee
- Active license
- Bond on file
- Insured
- 34 yrs licensed
A Santee ADU can be up to 1,200 sq ft, and the city accepts free County of San Diego plans plus Chula Vista and Encinitas pre-approved designs. Its fee waiver ended in 2024, so budget for impact and school fees. Here is what the city's July 2026 ADU guide says and how to get a permit.
Santee ADU facts
1 of these builders is based in Santee. Each holds an active B license with a bond on file, checked with the state on Oct 26, 2026.
Santee
Escondido
San Diego
San Diego
San Diego
Chula Vista
Santee's ADU rules are in Santee Municipal Code § 13.10.045. The city summarizes them in its ADU guide, current as of July 2026, which also points you to the state ADU statutes for anything the local code doesn't cover. Detached ADUs and conversions are allowed in single-family and multifamily zones; attached ADUs and junior ADUs go with single-family homes.
| Rule | Santee |
|---|---|
| Detached ADU size | 800 to 1,200 sq ft |
| Attached ADU size | Up to 800 sq ft on the streamlined path, up to 1,200 sq ft with more objective standards |
| Conversion ADU | The existing space, plus up to 150 sq ft for an entry |
| Junior ADU | Up to 500 sq ft inside the house or attached garage |
| Height | Detached: 16 ft, or 18 to 20 ft within a half-mile walk of a major transit stop. Attached and conversions: the zone's limit |
| Side and rear setbacks | 4 ft for new ADUs; conversions only need what building and fire codes require |
| Lot coverage | 25% to 75%, depending on the zone |
| Parking | Only for ADUs over 800 sq ft more than a half-mile walk from transit; none for conversions |
| Owner occupancy | None for ADUs; required for a JADU or the house if they share a bathroom |
| Rentals | 30 days minimum; no short-term rentals |
| Selling the ADU separately | Not allowed |
A few details in the guide are easy to miss. Fire sprinklers are required in the ADU only if the main house has or needs them. A new two-story ADU, or an ADU built as a second-story addition, needs a licensed engineer. Every ADU has to meet the 2022 CALGreen Tier II voluntary measures and Santee's energy rules in SMC § 13.10.040(J) and (K); the newer guide cites the 2025 edition of the green code. See two-story ADUs and attached vs. detached ADUs for how these choices play out. The state baseline behind all of this is in California ADU laws, and the junior ADU rules are in our junior ADU guide.
Santee doesn't run its own plan library. Instead, under the state's pre-approved plan law, it accepts three sets of pre-approved plans from other agencies:
These plans aren't a full permit set. The city's ADU guide says you still need a site plan showing where the ADU goes and a foundation plan for your lot, and that modifications to pre-approved plans are not permitted. The city's housing page adds that the County plans are a starting point: you complete them for your site and current codes. Our pre-approved ADU plans guide compares the regional programs, and ADU floor plans covers layouts.
Santee waived ADU development impact fees for five years starting in September 2019, according to its 2021–2029 Housing Element. That fee waiver ended September 27, 2024, and ADUs now pay all fees normally collected at permit issuance. The city's ADU guide includes impact fee worksheets at rates effective July 1, 2026 (fiscal year 2026/27).
| Fee (single-family rate) | Per sq ft | 751 sq ft ADU | 1,200 sq ft ADU |
|---|---|---|---|
| Public facilities | $5.46 | $4,100.46 | $6,552.00 |
| Park in-lieu | $6.98 | $5,241.98 | $8,376.00 |
| Traffic mitigation | $2.81 | $2,110.31 | $3,372.00 |
| Fire facilities | $1.83 | $1,374.33 | $2,196.00 |
| Traffic signal | $0.39 | $292.89 | $468.00 |
| Drainage | $0.37 | $277.87 | $444.00 |
| Administration | $0.36 | $270.36 | $432.00 |
| Long range planning | $0.08 | $60.08 | $96.00 |
| Total | $18.28 | $13,728.28 | $21,936.00 |
ADUs under 750 sq ft pay no impact fees, as Santee's guide and state law both say. Above that size, state law requires the fee to be proportional to the main house's square footage. The city's worksheet examples show the full single-family rate, so ask staff how they apply the proportional rule to your house before you budget. These totals don't include building permit and plan check fees.
School fees apply only to ADUs over 500 sq ft. If your home is in the Santee School District (kindergarten through eighth grade) and the Grossmont Union High School District, you pay both:
| District | Residential rate | 800 sq ft ADU |
|---|---|---|
| Santee School District | $3.34/sq ft (effective May 2, 2026) | $2,672 |
| Grossmont Union High School District | $1.20/sq ft | $960 |
| Combined | $4.54/sq ft | $3,632 |
Grossmont Union's fee page says projects of 500 sq ft or less are exempt and that fees are due before the building permit is issued. For the full build budget, see what an ADU costs in San Diego or run the ADU cost calculator. Financing options are in our ADU financing guide.
Check three things about your lot before you design.
All building submittals go through the Santee Permitting and Licensing Portal. The Building Division no longer accepts paper plans and says it is not offering expedited review. Questions go to the Planning & Building Department at City Hall, 10601 Magnolia Avenue, Building 4, phone 619-258-4100 ext. 167, open Monday to Thursday 8 a.m. to 5 p.m. and Friday 8 a.m. to 1 p.m.
The city's guide lays out the steps: check your zoning, talk to staff about a preliminary layout, prepare plans signed by the person who drew them (an engineer for grading plans if needed), and submit a complete application. The guide says Santee will tell you within 30 days whether the application is complete. Current state law sets 15 business days for that check, then 60 days to approve or deny a complete application. After you pay permit, school and impact fees, you build, call for inspections, and receive a Certificate of Occupancy at final sign-off.
Santee issued one ADU permit in 2018, four in 2019 and 14 in 2020, and its housing plan set a goal of 80 ADUs from 2021 to 2029. Before you sign with a builder, read how to hire an ADU contractor, check a contractor's license, and compare verified ADU builders in San Diego County.
If you have an ADU or JADU that was built or converted without permits before January 1, 2020, Santee has a path to legalize it. Under the city's Substandard Building Checklist, you can get a confidential inspection from a licensed contractor, architect or engineer first, then apply with a site plan, a floor plan and the completed checklist. The checklist says no impact fees are required. A city building inspector does a pre-inspection, and you fix only the substandard conditions found under state health and safety law before the permit is finaled.
General information, updated Oct 26, 2026. Rules and fees change; confirm with the Santee permit office before you rely on them.